top of page
NEWS

Notice of construction on the exterior wall of the “Studio.3” building (until the end of January 2025)

Currently, construction on the exterior walls of the entire building at Kyu Kaigan Studio.3 is being carried out until the end of January 2025. Therefore, when photographing, there may be reflections of the scaffolding and seats as shown in the image.


Regarding the suspension of construction noise, we may be able to respond for a short period of time, so please contact us in advance.


Additionally, as the rooftop area is under construction, scaffolding and other materials may be reflected.


Basically, you cannot use the rooftop, but it may be possible depending on the date and time, so please contact us in advance about using the rooftop.


Thank you for your understanding and cooperation.


*Photos are current and the scaffolding situation may change in the future.














bottom of page